A contractor for the Kentucky Transportation Cabinet plans asphalt paving along KY 878 in OHIO County starting Wednesday. Paving along KY 878 runs from the KY 69 intersection at mile point 0.0 extending eastward to the KY 1164 intersection at mile point 2.877, a distance of 2.8 miles. Motorists should be prepared to encounter one lane traffic with alternating flow controlled by flaggers. Appropriate caution is required where equipment, flaggers, and construction personnel are along the roadway in close proximity to traffic flow. Scotty’s Contracting and Stone, LLC, is the prime contractor on this $191,998 highway improvement project. The anticipated completion date is June 30, 2015, weather permitting. Motorists should slow down and be alert for equipment, flaggers, and maintenance personnel on the bridge deck in close proximity to traffic flow.